Tuesday, Oct 20, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Hyderabad | Polavaram Project Backwaters Central Water Commission To Conduct Drainage Congestion Study In Six Telangana Streams

Polavaram project backwaters: Central Water Commission to conduct drainage congestion study in six Telangana streams

Decision follows inter-state meeting held recently between Telangana and Andhra Pradesh, facilitated by Polavaram Project Authority, to assess backwater effects of the project on Telangana’s streams

By Telangana Today
Published Date - 30 May 2025, 08:11 PM
Polavaram project backwaters: Central Water Commission to conduct drainage congestion study in six Telangana streams
File Photo
whatsapp facebook twitter telegram

Hyderabad: Addressing the inter-State concerns surrounding the Polavaram Irrigation Project (PIP), the Central Water Commission (CWC) has been tasked with the responsibility of conducting a drainage congestion study for six major streams in the erstwhile Khammam district of Telangana.

The decision follows an inter-state meeting held recently between Telangana and Andhra Pradesh, facilitated by the Polavaram Project Authority (PPA), to assess the backwater effects of the project on Telangana’s streams.

Also Read

  • Central Water Commission unhappy over delayed Polavaram project backwater study

The PPA, in a letter dated April 21, 2025, formally requested the CWC to undertake the study, citing the commission’s extensive experience and prior involvement in backwater studies for the Kinnerasani and Murreduvagu rivers.

The study aims to evaluate drainage congestion in six streams — Turubaka Vagu, Yetapaka, a local stream, Edullavagu, Peddavagu and Domalavagu — due to the backwater effects of the Polavaram reservoir, which could lead to submergence and flooding in Telangana.

In response, the CWC’s Hydrology (South) Directorate, New Delhi, issued a letter on May 23, 2025, requesting specific cross-sectional and geographical data for the six streams. The data include detailed cross-sections of the streams at specified intervals, along with latitude and longitude coordinates at their confluences with the Godavari river and, for Domalavagu, its confluence with the Kinnerasani river.

The CWC emphasised the need for jointly signed survey data from the governments of Andhra Pradesh and Telangana to ensure accuracy and transparency. To facilitate the study, the PPA has proposed that the CWC conduct the necessary ground surveys to collect the required data, given the sensitive inter-State nature of the issue. Ch Sanjeev, Assistant Director, has been appointed to coordinate with the CWC, and the PPA has committed to covering the associated survey costs.

Telangana has raised concerns about potential submergence of areas, including the temple town of Bhadrachalam and the Manuguru Heavy Water Plant, due to the Polavaram project’s backwaters. Telangana has also raised concerns about the project impact, particularly the risk of flooding and drainage congestion in its streams when the reservoir operates at full capacity. The State has cited past flood events, such as those in July 2022, which affected 99 villages and caused huge inundation around Bhadrachalam.

The Polavaram Irrigation Project, a multi-purpose national project on the Godavari river in Andhra Pradesh, aims to irrigate over 4.36 lakh hectares, generate 960 MW of hydropower and supply drinking water to 28.5 lakh people across 611 villages. However, its backwater effects have sparked issues with Telangana, Odisha and Chhattisgarh. It was already challenged the Supreme Court.

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • Bhadrachalam
  • Godavari River
  • Manuguru Heavy Water Plant
  • Polavaram Irrigation Project

Related News

  • Brimming Komaticheruvu reflects impact of Kaleshwaram project: Harish Rao

    Brimming Komaticheruvu reflects impact of Kaleshwaram project: Harish Rao

  • KTR blames Congress for drought, questions use of irrigation pumps

    KTR blames Congress for drought, questions use of irrigation pumps

  • Harish Rao urges Telangana government to use Godavari floodwater to fill reservoirs

    Harish Rao urges Telangana government to use Godavari floodwater to fill reservoirs

  • Devotees express displeasure over immersion of Ganesh idols in Godavari at Gudem

    Devotees express displeasure over immersion of Ganesh idols in Godavari at Gudem

Latest News

  • Three held by Malakpet police for alleged deer hunting in Karnataka

    21 minutes ago
  • DeepSeek barred from US federal civilian IT systems over security concerns

    31 minutes ago
  • US proposes $70,000 OPT fee per student, raising concerns for Indian graduates

    44 minutes ago
  • IAF Chief AP Singh flies Kiran aircraft at Dungial Air Force Academy

    57 minutes ago
  • Chaithra Achar-starrer ‘418 The Film’ gets chilling new trailer

    1 hour ago
  • Telangana Governor, CM greet people on Vijayadashami, pray for peace and prosperity

    1 hour ago
  • Kolkata police track fake social media posts on Durga Puja stampede

    2 hours ago
  • Indian-American voters make their presence felt in Texas, New York races

    2 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App