Tuesday, Apr 21, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Telangana | Rampurs Waste Woes Tackled Biomining Plant Revs Up To Resolve Legacy Waste

Rampur’s waste woes tackled: Biomining plant revs up to resolve legacy waste

The long-standing battle against toxic waste at the Kakatiya Solid Waste Management Park at Rampur near here has taken a positive turn with the Greater Warangal Municipal Corporation (GWMC) now successfully running a biomining plant.

By P. Laxma Reddy
Published Date - 18 December 2023, 04:25 PM
Rampur’s waste woes tackled: Biomining plant revs up to resolve legacy waste
GWMC commissioner Rizwanbasha Shaik and other officials inspect the biomining at Rampur 
whatsapp facebook twitter telegram

Hanamkonda: The long-standing battle against toxic waste at the Kakatiya Solid Waste Management Park at Rampur near here has taken a positive turn with the Greater Warangal Municipal Corporation (GWMC) now successfully running a biomining plant.

The facility, operational at full capacity, can process 900 metric tons of legacy waste daily. The officials are now focusing on speeding up the process following inordinate delays in processing the waste. Residents, vexed by years of protests and concerns over environmental hazards posed by the city’s dumpsite, have finally heaved a sigh of relief. The biomining process, employing specialized separator machines and sieves, efficiently categorizes waste into soil, plastic, wood, and metal components for further processing.

Also Read

  • Samajwadi Party stuns critics, leads in Mainpuri, Rampur, Khatauli
  • Dimple Yadav leads in Mainpuri
  • Bypolls: Voting underway in Mainpuri parliamentary and 2 assembly seats in UP

Earlier, with the GWMC disposing of around 400 metric tons of waste each day in the 31-acre Kakatiya SWM Park, the lack of a proper waste disposal plan had led to burning of garbage, causing severe air, water, and soil pollution in the vicinity. Frustrated locals from Rampur, Madikonda, Narsingaraopalle, and Elkurthi had persistently urged the civic body to relocate the dumpyard.

Meanwhile, GWMC Commissioner Shaikh Rizwanbasha’s directive to expedite the biomining process signals a focused effort to conclude this endeavour by the end of January 2024. During a recent inspection at the 46th division Rampur dumping yard, the Commissioner reviewed the ongoing biomining operations, emphasizing the need for speedy completion.

Presently, of the three lakh metric tonnes of accumulated garbage, approximately 1.5 lakh metric tonnes (about 50%) have already undergone neutralization through biomining. The remaining 1.5 lakh metric tonnes are slated for disposal by January end. To meet this goal, the daily processing capacity has reached 1600 metric tonnes, with plans to augment shifts, machinery, manpower, and resources.

Furthermore, the authorities have stressed adherence to minimum waste management standards during the biomining process. Additionally, they aim to channel the produced by-products and refuse-derived fuels (RDFs) to cement factories, while also educating farmers through the Department of Agriculture on using them as organic fertiliser.

  • Follow Us :
  • Tags
  • biomining projects
  • GWMC
  • Kakatiya Solid Waste Management Park
  • Rampur

Related News

  • Watch: Husband-wife dispute turns violent at Toopran police station in Medak

    Watch: Husband-wife dispute turns violent at Toopran police station in Medak

  • Hanamkonda: Rampur landfill sparks health crisis, residents plan indefinite stir after Sankrathi

    Hanamkonda: Rampur landfill sparks health crisis, residents plan indefinite stir after Sankrathi

  • Padi Kaushik Reddy demands Rs.50,000 aid for cyclone-hit cotton farmers

    Padi Kaushik Reddy demands Rs.50,000 aid for cyclone-hit cotton farmers

  • Warangal’s underground drainage plans remain on paper

    Warangal’s underground drainage plans remain on paper

Latest News

  • UoH, HAL launch Centre of Excellence in Digital Twin Technology

    2 mins ago
  • First batch of Telangana Haj pilgrims to depart on May 4

    4 mins ago
  • 12 dead in Thrissur fireworks blast, Pinarayi orders emergency response

    5 mins ago
  • IMD issues yellow alert for thunderstorms across Telangana

    6 mins ago
  • MEA says close monitoring of West Asia crisis, protecting Indian nationals

    11 mins ago
  • Hospital workers stage massive dharna in Hyderabad over pay hike

    16 mins ago
  • Teen dies after falling from balcony while making reels in Hyderabad

    19 mins ago
  • Hyderabad: Man booked for using fake number plate in Jubilee Hills

    24 mins ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

.