Monday, Nov 9, 2026
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • My Space
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • My Space
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | Andhra Pradesh | South Central Railway Commissions 16 7 Km Chirala Bapatla Third Line

South Central Railway commissions 16.7 km Chirala-Bapatla third line

South Central Railway successfully finished and inaugurated a 16.7 km segment of electrified third track connecting Chirala and Bapatla. This addition complements the extensive 288 km-long project, involving tripling and electrification, between Vijayawada and Gudur.

By PTI
Updated On - 20 October 2023, 10:25 PM
South Central Railway commissions 16.7 km Chirala-Bapatla third line
Representational Image.
whatsapp facebook twitter telegram

Vijayawada: The South Central Railway on Friday completed and commissioned a 16.7 km section of electrified third line between Chirala and Bapatla, supplementing the 288 km-long tripling and electrification project between Vijayawada and Gudur.

With the new infrastructural section, 189 km of railway line stands electrified with a third line between Vijayawada and Gudur.


The Vijayawada-Gudur third line project was sanctioned in 2015-’16 for a distance of 288 km at an approximate cost of Rs 3,246 crore, said a press release.

Of the 288 km stretch, 45 km section between Chirala-Karavadi and 127 km between Gudur and Singarayakonda have been completed and the new addition of 16.7 km stretch between Chirala and Bapatala has taken it to 189 km.

The Vijayawada-Gudur railway line in the state is located on the grand trunk route, which plays a crucial role in linking the Northern and Eastern parts of the country to South India.

As this route has become highly congested due to a steady rise in passenger and freight trains, the Railways sanctioned Vijayawada-Gudur tripling and electrification project.

“The Vijayawada-Gudur section by virtue of its location is very crucial for train operations between Northern, Eastern and Southern parts of the country and hence the works in all the stretches are being carried out simultaneously,” said SCR Zone general manager Arun Kumar Jain.

He noted that the completion of this project will ease congestion and improve efficiency of train operations.

Join Our Whatsapp Channel
  • Follow Us :
As preferred source
  • Tags
  • Bapatla
  • Chirala
  • South Central Railway

Related News

  • Secunderabad Railway Station sees festive rush ahead of Diwali, Chhath

    Secunderabad Railway Station sees festive rush ahead of Diwali, Chhath

  • South Central Railway lists available berths in special trains from Telangana

    South Central Railway lists available berths in special trains from Telangana

  • SCR warns passengers against carrying firecrackers on trains

    SCR warns passengers against carrying firecrackers on trains

  • Special trains from Charlapalli to Raxaul announced for Diwali and Chhath

    Special trains from Charlapalli to Raxaul announced for Diwali and Chhath

Latest News

  • Hardik Pandya’s possible PBKS move raises questions over team dynamics

    6 minutes ago
  • Former BRS MLA arrested on way to party worker’s funeral ahead of Revanth Reddy’s public meeting

    21 minutes ago
  • GHMC to launch Project Udvasana collection drive at 12 temples on November 14

    27 minutes ago
  • Diwali fires destroy car, motorcycle in Karimnagar; grocery store gutted in Utnoor

    1 hour ago
  • Kadem dam water row: Farmers stage protests in Mancherial, Nirmal districts

    1 hour ago
  • Hyderabad: Thousands throng Bhagyalakshmi Temple near Charminar on Deepavali

    2 hours ago
  • Ram Gopal Varma calls Ramayana a ‘devotional force’, praises Ranbir Kapoor, Yash and Anupam Kher

    2 hours ago
  • Sitanshu Kotak says New Zealand ODI conditions will help India prepare for Test series

    2 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

  • Telangana Today Telangana Today
Telangana Today Telangana Today

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam

Telangana Today App